Cisco 3750V2 Hardware Installation Guide

Summary of contents

  • Catalyst\x113750 Switch Hardware\x11Installation\x11Guide
  • Contents
    • Cisco Limited Lifetime Hardware Warranty Terms
    • Preface
      • Audience
      • Purpose
      • Conventions
      • Related Publications
      • Obtaining Documentation
        • Cisco.com
        • Documentation CD-ROM
        • Ordering Documentation
        • Documentation Feedback
      • Obtaining Technical Assistance
        • Cisco TAC Website
        • Opening a TAC Case
        • TAC Case Priority Definitions
      • Obtaining Additional Publications and Information
    • Using Express Setup
      • Taking Out What You Need
      • Powering On the Switch
      • Starting Express Setup
      • Configuring the Switch Settings
      • Verifying Switch IP Address (Optional)
      • Rerunning Express Setup
      • Where to Go Next
        • Other Switch Home Page Features
        • Installing or Connecting Devices to the Switch
    • Product Overview
      • Features
      • Front Panel Description
        • 10/100 and 10/100/1000 Ports
        • SFP Module Slots
          • SFP Modules
        • LEDs
          • System LED
          • RPS LED
          • Master LED
          • Port LEDs and Modes
      • Rear Panel Description
        • StackWise Ports
        • Power Connectors
          • Internal Power Supply Connector
          • Cisco RPS Connector
        • Console Port
      • Management Options
        • Network Configurations
    • Switch Installation
      • Preparing for Installation
        • Warnings
        • EMC Regulatory Statements
          • U.S.A.
          • Class A Notice for Taiwan and Other Traditional Chinese Markets
          • Japan
          • Class A Notice for Korea
        • Class A Notice for Hungary
        • Installation Guidelines
        • Verifying Package Contents
        • Verifying Switch Operation
          • Connecting a PC or Terminal to the Console Port
          • Powering On the Switch and Running POST
          • Powering Off the Switch and Disconnecting the Console Port
      • Planning the Stack
        • Planning Considerations
        • Powering Considerations
        • Cabling Considerations
        • Recommended Cabling Configurations
      • Installing the Switch
        • Rack Mounting
          • Removing Screws from the Switch
          • Attaching Brackets to the Catalyst 3750G-24TS Switch
          • Attaching Brackets to the Catalyst\x113750-24TS, 3750G-24T, 3750G-12S, and 3750-48TS Switches
          • Mounting the Switch in a Rack
          • Attaching the Cable Guide
        • Wall Mounting
          • Attaching the Brackets to the Switch for Wall-Mounting
          • Attaching the RPS Connector Cover
          • Mounting the Switch on a Wall
          • Table or Shelf Mounting
      • Connecting StackWise Cable to StackWise Ports
      • Installing and Removing SFP Modules
        • Installing SFP Modules into SFP Module Slots
        • Removing SFP Modules from SFP Module Slots
      • Connecting to the 10/100 and 10/100/1000 Ports
      • Connecting to an SFP Module
        • Connecting to a Fiber-Optic SFP Module
        • Connecting to 1000BASE-T SFP Modules
      • Where to Go Next
    • Troubleshooting
      • Understanding POST Results
      • Clearing the Switch IP Address and Configuration
      • Diagnosing Problems
      • Replacing a Failed Stack Member
    • Technical Specifications
    • Connector and Cable Specifications
      • Connector Specifications
        • 10/100/1000 Ports
          • Connecting to 10BASE-T- and 100BASE-TX-Compatible Devices
          • Connecting to 1000BASE-T Devices
        • 10/100 Ports
        • SFP Module Ports
        • Console Port
      • Cable and Adapter Specifications
        • Two Twisted-Pair Cable Pinouts
        • Four Twisted-Pair Cable Pinouts for 10/100 Ports
        • Four Twisted-Pair Cable Pinouts for 1000BASE-T Ports
        • Crossover Cable and Adapter Pinouts
          • Identifying a Crossover Cable
          • Adapter Pinouts
    • Managing the Switch by Using the Cluster Management Suite
      • Connecting to an Ethernet Port
      • Launching the Switch Home Page
      • CMS Requirements
        • Recommended Configuration for Web-Based Management
        • Operating System and Browser Support
        • Supported Java Plug-Ins
        • Java Plug-In Notes
      • Where to Go Next
    • Quick Setup By Using the CLI-Based Setup Program
      • Methods for Accessing the CLI
        • Accessing the CLI Through Express Setup (Unconfigured Switch Only)
        • Accessing the CLI Through the Console Port
      • Taking Out What You Need
      • Stacking the Switches (Optional)
      • Connecting to the Console Port
      • Starting the Terminal Emulation Software
      • Connecting to a Power Source
      • Entering the Initial Configuration Information
        • IP Settings
        • Completing the Setup Program
    • Translated Safety Warnings
      • Attaching the Cisco RPS (model PWR300-AC-RPS-N1)
      • Attaching the Cisco RPS (model PWR675-AC-RPS-N1)
      • Installation Warning
      • Installation Instructions
      • Jewelry Removal Warning
      • Stacking the Chassis Warning
      • Main Disconnecting Device
      • Grounded Equipment Warning
      • Installing or Replacing the Unit
      • Overtemperature Warning
      • Working During Lightning Activity
      • Product Disposal Warning
      • Chassis Warning for Rack-Mounting and Servicing
      • Redundant Power Supply Connection Warning
      • Switch Installation Warning
      • Restricted Area
      • Ethernet Cable Shielding in Offices
      • Laser Beam Exposure
      • Laser Radiation
    • Index
pdf background image
download button

Related manuals