Compaq StorageWorks 64 FW 07.00.00/HAFM SW 08.06.00 McDATA Products in a SAN E

Summary of contents

  • Contents
  • Preface
  • Introduction to McDATA Multi-Protocol Products
    • Product Overview
      • Multi-Protocol Hardware
      • SAN Management Applications
    • Directors
      • Director Performance
      • Intrepid 6064 Director
      • Intrepid 6140 Director
      • Intrepid 10000 Director
    • Fabric Switches
      • Fabric Switch Performance
      • Sphereon 3232 Fabric Switch
      • Sphereon 4300 Fabric Switch
      • Sphereon 4500 Fabric Switch
    • SAN Routers
      • SAN Router Performance
      • Eclipse 1620 SAN Router
      • Eclipse 2640 SAN Router
    • Product Features
      • Connectivity Features
      • Security Features
      • Serviceability Features
  • Product Management
    • Product Management
      • Out-of-Band Management
      • Inband Management
      • Management Interface Summary
    • Management Server Support
      • Management Server Specifications
      • Ethernet Hub
      • Remote User Workstations
    • Product Firmware
      • Firmware Services
    • Backup and Restore Features
    • SAN Management Applications
      • SANavigator and EFCM Applications
      • SANvergence Manager Application
    • SANpilot Interface
    • Command Line Interface
  • Planning Considerations for Fibre Channel Topologies
    • Fibre Channel Topologies
    • Characteristics of Arbitrated Loop Operation
      • Shared Mode Versus Switched Mode
      • Public Versus Private Devices
      • Public Versus Private Loops
      • FL_Port Connectivity
    • Planning for Private Arbitrated Loop Connectivity
    • Planning for Fabric-Attached Loop Connectivity
      • Connecting FC-AL Devices to a Switched Fabric
      • Server Consolidation
      • Tape Device Consolidation
    • Fabric Topologies
      • Mesh Fabric
      • Core-to-Edge Fabric
      • SAN Islands
    • Planning for Multiswitch Fabric Support
      • Fabric Topology Limits
      • Factors to Consider When Implementing a Fabric Topology
    • General Fabric Design Considerations
      • Fabric Initialization
      • Fabric Performance
      • Fabric Availability
      • Fabric Scalability
      • Obtaining Professional Services
    • Mixed Fabric Design Considerations
      • FCP and FICON in a Single Fabric
      • Multiple Data Transmission Speeds in a Single Fabric
    • FICON Cascading
      • High-Integrity Fabrics
      • Minimum Requirements
      • FICON Cascading Best Practices
  • Implementing SAN Internetworking Solutions
    • SAN Island Consolidation
      • Flexible Partitioning Technology
      • SAN Routing
    • Implementing BC/DR Solutions
      • Extended-Distance Operational Modes
      • SAN Extension Transport Technologies
      • Distance Extension Through BB_Credit
      • Intelligent Port Speed
      • Distance Extension Best Practices
    • Consolidating and Integrating iSCSI Servers and Storage
      • iSCSI Protocol
      • iSCSI Server Consolidation
      • iSCSI Storage Consolidation
  • Physical Planning Considerations
    • Port Connectivity and Fiber-Optic Cabling
      • Port Requirements
      • SFP Optical Transceivers
      • Extended-Distance Ports
      • High-Availability Considerations
      • Fibre Channel Cables and Connectors
      • Routing Fiber-Optic Cables
    • Management Server, LAN, and Remote Access Support
      • Management Server
      • Remote User Workstations
      • SNMP Management Workstations
      • SANpilot Interface
    • Security Provisions
      • Password Protection
      • SANtegrity Authentication
      • SANtegrity Binding
      • PDCM Arrays
      • Preferred Path
      • Zoning
      • Server and Storage-Level Access Control
      • Security Best Practices
    • Optional Feature Keys
      • Inband Management Access
      • Flexport Technology
      • SANtegrity Authentication
      • SANtegrity Binding
      • OpenTrunking
      • Full Volatility
      • Full Fabric
      • Remote Fabric
      • CNT WAN Support
      • Element Manager Application
  • Configuration Planning Tasks
    • Task 1: Prepare a Site Plan
    • Task 2: Plan Fibre Channel Cable Routing
    • Task 3: Consider Interoperability with Fabric Elements and End Devices
    • Task 4: Plan Console Management Support
    • Task 5: Plan Ethernet Access
    • Task 6: Plan Network Addresses
    • Task 7: Plan SNMP Support (Optional)
    • Task 8: Plan E-Mail Notification (Optional)
    • Task 9: Establish Product and Server Security Measures
    • Task 10: Plan Phone Connections
    • Task 11: Diagram the Planned Configuration
    • Task 12: Assign Port Names and Nicknames
    • Task 13: Complete the Planning Worksheet
    • Task 14: Plan AC Power
    • Task 15: Plan a Multiswitch Fabric (Optional)
    • Task 16: Plan Zone Sets for Multiple Products (Optional)
    • Task 17: Plan SAN Routing (Optional)
    • Task 18: Complete Planning Checklists
  • Product Specifications
    • Director, Fabric Switch, and SAN Router Specifications
      • Dimensions
      • Power Requirements
      • Heat Dissipation
      • Clearances
      • Acoustical Noise and Physical Tolerances
      • Storage and Shipping Environment
      • Operating Environment
    • FC-512 Fabricenter Cabinet Specifications
      • Dimensions
      • Power Requirements
      • Clearances
      • Cabinet Footprint
  • Firmware Summary
    • System-Related Differences
    • Fibre Channel Protocol-Related Differences
    • Management-Related Differences
  • Index
pdf background image
download button

Related manuals