1.GENERAL INFORMATION
1.1.INTRODUCTION
1.2.SAFETY INFORMATION
1.3.ATEX CERTIFICATION
1.4.INSTALLATION AND OPERATIONAL INSTRUCTIONS
1.4.1.Drilling Motor Model 5GEB22 Operational Requirements
1.4.2.5GEB22 Motor Equipped with Closed Loop Cooling System
1.4.3.Drive Systems Used with the 5GEB22
1.4.4.Grounding Instructions
1.4.5.Grounding Procedures
1.4.6.Motor Coupling and Alignment
1.4.6.1.Coupled Drives
1.4.6.2.V-Belt Drives
1.4.6.3.Grouting
1.4.6.4.Flexible Coupling Alignment Procedure
1.5.MODEL DIFFERENCES
2.CONTROLS AND INDICATORS
3.FUNCTIONAL DESCRIPTION
4.SCHEDULED MAINTENANCE
4.1.MONTHLY SCHEDULED MAINTENANCE PROCEDURE
4.1.1.Covers, Seals, and Latches
4.1.2.Power Cable Inspection
4.1.3.Megohmmeter Test
4.1.4.Motor Mounting Hardware
4.2.CLEANING THE MOTOR
5.REMOVAL AND REPLACEMENT PROCEDURES
5.1.MOTOR PREPARATION FOR SHIPMENT
5.1.1.Rotor Locking for Shipment
5.1.2.Motor Packaging for Shipment
5.1.3.Motor Storage
5.2.DISASSEMBLY PROCEDURES
5.2.1.Hub Removal
5.2.2.Rotor Removal
5.2.3.Connection End (CE) Bearing Assembly Removal
5.2.3.1.Connection End Bearing Assembly Removal Procedure for 5G
5.2.3.2.Connection End Bearing Assembly Removal Procedure for 5G
5.2.4.Drive End Bearing Assembly Removal
5.2.5.Connection End Frame Head Removal
5.3.INSPECTION AND REPAIR PROCEDURES
5.3.1.Rotor Shaft Inspection
5.3.2.Stator Coils and Bus Rings Connection Inspection
5.3.2.1.Repairing Stator Coils to Bus Ring Connection, Cleaning
5.3.2.2.Repairing Stator Coils to Bus Ring Connection, Brazing a
5.3.3.Stator / Rotor Reconditioning
5.4.STEAM CLEANING
5.4.1.Steam Cleaning Introduction
5.5.STATIC ELECTRICAL TESTING
5.5.1.Static Electrical Testing Introduction
5.5.1.1.Megohmmeter Test
5.5.1.2.High–Potential (Hi–Pot) Test
5.6.ROTOR SUBASSEMBLY PROCEDURES
5.6.1.Rotor Balancing
5.6.2.Connection–End (CE) Frame Head Installation
5.6.3.Connection−End (CE) Bearing Assembly
5.6.4.Drive End (DE) Bearing Assembly
5.7.ROTOR INSTALLATION INTO THE STATOR FRAME
5.8.MOTOR BEARING CHECKS AFTER ASSEMBLY
5.8.1.Connection End (CE) Bearing Runout Check
5.8.2.Drive End (DE) Bearing Runout Check
5.8.3.Drive End (DE) Bearing Radial Clearance Check
5.8.4.Rotor Shaft End–Play Check
5.9.FINAL ASSEMBLY OF ROTOR DRIVE END (DE) COMPONENTS
5.10.FINAL ASSEMBLY OF ROTOR CONNECTION END (CE) COMPONENTS
5.11.ELECTRICAL RUNNING TESTS
5.12.HUB INSTALLATION
5.12.1.Hub Fitting
5.12.2.Hub Mounting
6.SUMMARY DATA
6.1.DRILL MOTOR DATA
6.1.1.Drill Motor Application Data
6.1.2.Drill Motor General Data
6.1.3.Drill Motor Lubricant D6A2C10 Data
6.2.DRILL MOTOR COMPONENT IDENTIFICATION
6.3.INSPECTION DATA
6.3.1.Rotor Shaft Inspection Data
6.4.SPECIAL TOOLS AND MATERIALS
6.4.1.Standard Removal Tool Assemblies
6.4.2.Individual Components of Tool Assemblies
6.4.3.Other Special Tools and Materials
6.4.3.1.DE Hub Removal Tool Assembly
6.4.3.2.Bearing Nut Spanner Wrench
6.4.3.3.CE Dummy Bearing Cap
6.4.3.4.DE Bearing Guide
6.4.3.5.DE Dummy Bearing Cap
6.4.3.6.Hub Installation Advance Gage